Boston-based Nexamp has commenced operations at a 2.3 MW solar project in Winchendon, Mass.
The ground-mounted installation is located on the 30-acre site of a former sand pit, adjacent to the town's salvage yard, and Nexamp was responsible for the development, design, financing and installation of the project.
Link to Full Article