Nexamp has worked with IBEW Local 103 to build a solar + storage project operated by Nexamp. Nexamp plans to utilize the 100 kW/ 210 kWh AC-coupled, lithium-ion battery energy storage system and 220 kW solar array to reduce IBEW's demand charges and overall energy costs.

Nexamp’s project with IBEW Local 103 is located in Dorchester, MA and builds on IBEW’s history of strong environmental stewardship and leadership. Located behind IBEW’s meter, the system is expected to produce 265,000 kWh of electricity per year, meeting more than 60% of the building’s electricity needs with clean energy. Pairing the solar array with energy storage will allow IBEW to store electricity produced by the solar array to use when it is most needed, meeting peak demand and reducing demand charges by up to 33%.

Application:
Rooftop